
Factory Exterior
A view of the factory building and loading access.
Understand the checks that turn a packaging concept into a written production specification.

CheriPack · Wenzhou, Zhejiang, China
Work directly with CheriPack on paper bags and gift boxes. Start with a reviewed specification and physical sample, then confirm production checks and protective packing. Jennifer coordinates your requirements through each stage.

A view of the factory building and loading access.

Paper cutting equipment for preparing sheets to the reviewed production size.

Printing equipment and sheet preparation, shown in the supplied workshop photograph.

An assembly work area with printed boxes, packing tables and production equipment.

Paper-processing equipment shown in the supplied production scene.

Paper and board staged for production.

Prepared sheets and unfinished materials organized between production stages.

Shelves of packaging samples for discussing structures, paper colors and finishes.

Packed cartons and clear warehouse aisles for dispatch preparation.

A sheet-printing production line with paper stacked at the feed end.
Supplied workshop and showroom references. The collection also includes earlier scenes digitally enhanced and retouched with AI. Order specifications and production scope are agreed separately.
Share the product, dimensions, quantity, artwork, destination and required arrival date.
Sample preparation: 5–7 days. Review color, fit, handle attachment and finishing before approval.
10–15 days after approval. Confirm the final order specification and production schedule.
Choose sea freight, Train, air freight and express courier. Freight transit is quoted separately for your destination.
Check finished dimensions with the actual filled product, including tissue and inserts.
Review the physical color reference and selected finish under appropriate lighting.
Check attachment positions, knots or fastening, top reinforcement, lid fit and opening feel.
Confirm special-finish alignment, legibility, logo position and approved artwork layers.
Review folding, insertion, packing sequence and outer transport protection.
Record the final material, dimensions, artwork, finish and sample revision for the bulk order.
| Sampling | 5–7 days; preparation schedule confirmed after review. Courier transit additional. |
|---|---|
| Bulk production | 10–15 days following final approvals; schedule confirmed by project. |
| Transit | Freight timing depends on destination, shipment method and agreed scope. |
| Shipping methods | Sea freight, Train, air freight and express courier. State the delivery country, city and postcode. |
Have a specification or only a budget? Start with what you know.